Thursday, October 15, 2015

Fett Boy progress

Here is a photo of said progress. The lower body is all together save for tying on a shock cord. The fins turned out fine. I did paper the side opposite the fiberglass sheet. The Fett bank is merely dry-fit in the photo. I need to get a small eye bolt to finish the assembly.  But, that's generally what it will look like. It is about an inch taller than a true upscale. Once all the parts are there, I will do a final assessment of the nose weight requirement.

20151015_125350